Skip to product information
1 of 4

Printify

WBS Wide Truck T-Shirt — Large Back Logo, Small Chest Emblem

WBS Wide Truck T-Shirt — Large Back Logo, Small Chest Emblem

Regular price $29.99 USD
Regular price Sale price $29.99 USD
Sale Sold out
Shipping calculated at checkout.
Color
Size
Quantity

This T-shirt carries the roar of the road and the hush of the garage. Low and wide Super Duty with WBS logo spans the back while a smaller WBS mark on the chest keeps the identity close to the heart. It feels substantial without weighing you down — cotton that’s been combed and preshrunk so it wears in, not out. The collar holds its shape after repeated washes, and reinforced seams mean this shirt moves with you through pit stops, car meets, and long rides. Wear it with a grease-streaked jacket or a worn denim shirt; it slips into the rhythm of people who measure time in miles and torque, and who appreciate clothing that lasts as long as their projects do. Stay strong white boy.

Product features

- 100% preshrunk combed ring-spun cotton (solid colors); heather blends where noted

- Medium-weight fabric (6.0 oz/yd²) for durability with comfortable drape

- Seamless ribbed knit collar for stretch and shape retention

- Twill shoulder and neck tape to prevent stretching and stabilize fit

- Double-needle stitching on sleeves and hem for reinforced longevity

Care instructions

- Machine wash: cold (max 30C or 90F)

- Non-chlorine: bleach as needed

- Tumble dry: low heat

- Iron, steam or dry: low heat

- Do not dryclean

View full details